Skip to main content
Loading…
This section is included in your selections.

A. Whenever an existing building, house or structure is moved from its present location outside the City to a new location within the City, or from one location within the City to another location within the City, the house mover or other person, firm or corporation moving a house, building, or structure shall, prior to moving, file an application for a moving permit with the Building and Housing Department. Said application shall contain the following information:

1. Present location of building to be moved;

2. Location to which it is proposed to move the building;

3. Route proposed to be followed in moving the building;

4. A sufficient number of detailed plans and specifications of work to be done which shall include and indicate all exterior and interior alterations and decorating, elevations, additions and repairs, together with such other plans and plats that may be required by any other ordinance of the City;

5. Multifamily projects shall be processed through the Planning Commission, as provided under CVMC 19.28.180 and 19.28.190. The fee shall be as specified in the master fee schedule;

6. Colored photographs of building elevation before moving and buildings immediately adjacent to new building location;

7. A termite and fungus inspection report by a California-licensed pest control company. Infestation and fungus, when found, shall be corrected and a certificate issued by the pest control company doing the work.

B. Any application for a permit to move any building, house or structure may be denied by the Director of Building and Housing if, in the opinion of the Director of Building and Housing, the building, house or structure cannot be altered or rehabilitated to conform to the Uniform Housing Code as adopted by the City. Upon receipt of said application and the payment of a plan check fee, the Director of Building and Housing shall cause an inspection to be made of the building or structure and a report of said inspection shall be forwarded to the Planning Department with recommendations for remodeling. The Planning Department shall process the application. (Ord. 3268 § 3, 2013; Ord. 1851 § 1, 1979; Ord. 1780 § 1, 1978; Ord. 1590 § 1, 1974; Ord. 1048 § 1, 1967; Ord. 751 Art. 2 § 2, 1961).