Skip to main content
Loading…
This section is included in your selections.

The permittee shall have the responsibility to ascertain the adequacy of the route requested for the move. When an overheight load is authorized (over 13 feet, 6 inches), the permittee shall check all underpasses, bridges, overhead wires, and other limiting structures or facilities for adequate clearance. The permittee shall notify the owners of all overhead lines or structures subject to disturbances or damage by his move and shall make arrangements for the temporary removal or relocation of the conflicting facility if required. The permittee shall bear all costs for such relocation where the facility is located in accordance with state and local regulations. (Ord. 1205 § 2, 1969; prior code § 27.216(2)).