Skip to main content
Loading…
This section is included in your selections.

Area, lot width, and yard requirements in the R-E zone shall be as follows (see CVMC 19.16.020, 19.16.050, 19.16.060 and 19.16.080 for exceptions and modifications):

A. All buildings, including accessory buildings and structures, in the residential estates zone shall not cover more than 40 percent of the lot;

B. The following minimum requirements shall be observed, except as modified for conditional uses. The minimum lot area required shall be designated on the zoning map:

Setbacks in Feet

Classification

Minimum Lot Area (sq. ft.)

Minimum Lot Width (ft.)

Front

Exterior Side Yard

One Side Yard

Both Side Yards

Rear

R-E 4A

4 acres

200

25*

20*

15

30

25

R-E 2A

2 acres

200

25*

20*

15

30

25

R-E 40

40,000

150

25*

20*

15

30

25

R-E

20,000

100

25*

15*

10

20

25

*Or not less than that specified on the building line map shall be provided and maintained. The setback requirements shown on the adopted building line map for Chula Vista shall take precedence over the setbacks required in the zoning district.

(Ord. 3153 § 2 (Exh. A), 2010; Ord. 1356 § 1, 1971; Ord. 1212 § 1, 1969; prior code § 33.502(G)).