Skip to main content
Loading…
This section is included in your selections.

Within 20 days after receiving the parcel map accompanied by all required documents, the City Engineer (and a registered land surveyor if the City Engineer was registered in the state of California later than 1982), shall examine the parcel map for survey information shown thereon, compliance with the provisions of this chapter, and conformity to the tentative parcel map. If he is satisfied that the submission is technically correct and complete, he shall place the following certification on the map:

I hereby certify that I have examined this map and have found that the subdivision as shown is substantially the same as it appeared on the tentative map, if required, and any approved alterations thereof; and that it complies with all the provisions of the Subdivision Map Act of the state of California, and any local ordinance of the City of Chula Vista applicable at the time of approval of the Tentative Parcel Map.

(Signed and Stamped) ________________________

City Engineer

I, the undersigned hereby certify that this map is technically correct

(Signed and Stamped by a Registered Land Surveyor or a Civil engineer registered in the state of California prior to 1982)

______________________

(Ord. 3153 § 2 (Exh. C), 2010).