A. After demolishing or removal of any building from a parcel of land in the City, the house mover or owner of the parcel shall comply with the following conditions with respect to such parcel:

1. Securely cap and seal all gas, water, oil and any other utility pipes disconnected from the building;

2. Securely seal all sewer and other sanitary facilities;

3. Fill with sand or small gravel all excavations, including cesspools, septic tanks and wells;

4. Remove all refuse, debris, old foundations, walls, curbs, waste material and other impediments. Flat work concrete, level with surrounding ground, may remain.

B. Within 20 days after removal of a building, the house mover or owner of the parcel shall file with the Building and Housing Department a letter certifying that all the provisions of this chapter have been complied with. (Ord. 1851 § 1, 1979).