Skip to main content
Loading…
This section is included in your selections.

In the event that the principal or surety fails to complete such work within the time specified in the notice, or fails to deposit the estimated cost plus 25 percent with the City, the Director of Public Works may cause the required work to be completed. The principal and the surety shall be liable for the cost of completing such work. (Ord. 1205 § 2, 1969; prior code § 27.402(4)).