Skip to main content
Loading…
This section is included in your selections.

No person, either as property owner, contractor, private engineer or otherwise, shall do or shall cause to be done any land development work without first having obtained either a land development permit or clearing and grubbing permit to do such work and having held a pregrading or preclearing meeting if required by the City Engineer, except as provided in CVMC 15.04.150.

Soil investigations by a soil engineer or engineering geologist which involves trenching or scarifying of the natural terrain shall require a permit. A special investigation fee shall be paid prior to issuance of such permit. (Ord. 3005 § 1, 2005; Ord. 1797 § 1, 1978).